Construction sites are constantly changing and this assessment looks at how a site is established for effective management. Students work in groups of 5 and choose an actual construction site to develop the plan for. The plan needs to address aspects such as selecting and locating temporary facilities (such as site huts) and major items of construction plant (such as the tower crane), designing and installing erosion and sediment control measures, security hoarding and scaffolding systems, managing demolition and waste material, and safety compliance. Each plan specifies when an activity is to take place and the resources required to ensure a smooth and effective site establishment process.